西宁新华联童梦乐园

发布:1 浏览:106次

西宁新华联童梦乐园

项目信息:新华联国际旅游城海洋馆项目,总亚克力用量208 吨,有直板、弧形板、隧道用板;直板最厚为390mm,长为17m;弧形板热弯180°,长为30.4m,厚度为130mm。


Xining Xinhualian Children's Dream Park

The Xinhualian International Tourism City Aquarium project has a total acrylic usage of 208 tons, including flat panels, curved panels, and tunnels; The thickest flat panel is 390mm and the length is 17m; The curved panel is hot bent 180 °, with a length of 30.4m and a thickness of 130mm.